Can the pipes for supply and return be laid in the screed?
Supply and return pipes can also be laid directly in the screed (siee also "How much distance do I need to lay the pipes from the supply and return to the floor?").
The question of whether the pipes are laid before or after the screed depends on the scheduling of the building project and should therefore be discussed with the heating engineer on site.
